The build only runs as fast as the parts arrive.

Component sourcing is where a manufacturer takes that risk on your behalf: buying against your bill of materials, verifying what arrives, managing your consigned stock, and telling you early when something is going to slip — rather than letting the schedule fail quietly until the shipment is late.

Why the BOM is reviewed before anything is orderedA bill of materials is a description of what a design needs.

It is not always a description of what is available.

Before ordering, the BOM is checked for the things that quietly delay a programme:- Obsolete parts — no longer manufactured, no longer stocked, and no longer orderable.- Single-source risk — one part from one supplier, where that supplier has a lead time nobody has checked.- Long-lead items — parts with a quoted lead time longer than the rest of the programme by a wide margin.- Unacceptable substitutions — where the alternative part is not the same part electrically, and a second-source change becomes a design change.This review happens before the purchase order, because the useful moment to change a part is before it is bought, not after the line is waiting for it.

Where the components come fromAuthorised distributors and qualified supply-chain partners, with cost and availability confirmed in writing before the order is placed.

The distinction matters: an authorised channel carries traceability to the original manufacturer, and traceability is what makes an incoming inspection meaningful rather than a formality.Consignment works too.

If you already own the components, we build from your stock.

Incoming inspection on every lotEvery lot is checked against the part number before it reaches the line, and the condition is checked against your specification — not just the reel label, but the actual parts.

This is where counterfeit and remarked stock gets caught, because the label on a reel can be reprinted and the parts inside it cannot.Verification happens against the lot, so the records connect to the specific shipment and the specific batch that went into your boards.

Consignment and stock controlConsigned components are held, tracked, and consumed against your build, with a running view of what is on hand.

In practice this means you can answer “how much of part X do I have, and where is it” without emailing someone and waiting for a spreadsheet.It also means your stock is only used for your builds.

Material in the warehouse belongs to the customer who sent it, and the records reflect that.

What to send for a sourcing reviewThe BOM, ideally with the manufacturer part numbers intact, and the Gerber files so the assembly can be checked against it.

If you have a specific concern — an end-of-life notice, a price increase, a component you are not sure about — say which part, because the review is much more useful when it is aimed at the thing that is actually worrying you.Send the BOM and we will come back with what is risky, what is long-lead, and what is fine.